OPNAV 1500.47D 海军培训配额管理

VIP文档

ID:55282

阅读量:0

大小:0.32 MB

页数:24页

时间:2023-05-14

金币:10

上传者:战必胜
DEPARTMENT OF THE NAVY
OFFICE OF THE CHIEF OF NAVAL OPERATIONS
2000 NAVY PENTAGON
WASHINGTON, DC 20350-2000
OPNAVINST 1500.47D
N13M
2 Mar 2022
OPNAV INSTRUCTION 1500.47D
From: Chief of Naval Operations
Subj: NAVY TRAINING QUOTA MANAGEMENT
Ref: (a) OPNAVINST 1500.27G
(b) OPNAVINST 1510.10D
(c) OPNAVINST 1500.76D
Encl: (1) Definitions and Acronyms
(2) Student Input Plan Development Process
(3) Quota Utilization and Modification Process
1. Purpose. To assign roles and responsibilities for managing and controlling all quotas for
Navy training courses and Navy attendance at Interservice training courses. This revision
updates the training quota management process and reflects the transition of Production
Management Office to Naval Education and Training Command (NETC) N3. This instruction is
a complete revision and should be reviewed in its entirety.
2. Cancellation. OPNAVINST 1500.47C.
3. Objective. To establish guidelines and responsibilities for optimizing training resources,
managing and controlling training capacity, minimizing not-under-instruction time while
assigned to training centers and avoiding missed training opportunities.
4. Definitions. See enclosure (1).
5. Scope and Applicability. This instruction applies to the allocation of quotas in all Navy
training courses for Navy and other Armed Services military personnel (officer and enlisted),
Department of Defense (DoD) civilians, international military students, as well as quotas for
Navy personnel attending other Services’ courses. Procedures for Interservice and defense
training are set forth in reference (a). Procedures for Corporate enterprise and Training Activity
Resource System (CeTARS) can be found in reference (b). Procedures for planning,
determining and documenting manpower, personnel, training and education (MPT&E)
requirements for new and modernized acquisition systems can be found in reference (c).
Enclosure (2) outlines the process used to develop, approve and load the Student Input Plan (SIP)
and enclosure (3) provides guidance and timelines for standard training quota utilization and
processes for emergent quota modifications.
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭