OPNAV 4700.8L w CH-1 正在建造或改装的美国海军舰艇的试验、验收、调试、试航和试航后的可用性

VIP文档

ID:55581

阅读量:0

大小:0.42 MB

页数:25页

时间:2023-05-14

金币:10

上传者:战必胜
DEPARTMENT OF THE NAVY
OFFICE OF THE CHIEF OF NAVAL OPERATIONS
2000
NAVY PENTAGON
W
ASHINGTON, DC 20350-2000
OPNAVINST 4700.8L CH-1
N9
3 Sep 2021
OPNAV INSTRUCTION 4700.8L CHANGE TRANSMITTAL 1
From: Chief of Naval Operations
Subj: TRIALS, ACCEPTANCE, COMMISSIONING, FITTING OUT, SHAKEDOWN,
AND POST-SHAKEDOWN AVAILABILITY OF U.S. NAVAL SHIPS
UNDERGOING CONSTRUCTION OR CONVERSION
Encl: (1) Revised Page 5
(2) Revised Page 14
(3) Revised Page 17
(4) Revised Page 2 of Enclosure (1)
1. Purpose. To transmit new pages 5, 14, 17 and page 2 of enclosure 1 of the basic instruction
to clarify the President, Board of Inspection and Survey responsibilities at preliminary
acceptance concerning fleet introduction, to change when final contract trials are generally
conducted for new construction ships and to clarify the status of non-nuclear ships from
preliminary acceptance through commissioning. These changes are necessary to correct errors
that were included in the final signed document.
2. Action. Remove the pages of the basic instruction identified in paragraph 1 of this change
transmittal and insert enclosures (1) through (4).
3. Records Management. Records created as a result of this change transmittal, regardless of
media or format, must be managed per Secretary of the Navy Manual 5210.1 of January 2012.
S.D. CONN
Deputy Chief of Naval Operations,
Warfighting Requirements and
Capabilities
Releasability and distribution:
This change transmittal is cleared for public release and is available electronically only via
Department of the Navy Issuances Web site, https://www.secnav.navy.mil/doni/default.aspx.
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭