OPNAV 9220.2C 美国海军锅炉水和给水测试和处理计划(不包括核电)。

VIP文档

ID:55791

阅读量:0

大小:0.04 MB

页数:7页

时间:2023-05-14

金币:10

上传者:战必胜
DEPARTMENT OF THE NAVY
OFFICE OF THE CHIEF OF NAVAL OPERATIONS
2000
NAVY PENTAGON
W
ASHINGTON, DC 20350-2000
OPNAVINST 9220.3A
N96
19 Aug 2015
OPNAV INSTRUCTION 9220.3A
From: Chief of Naval Operations
Subj: PROPULSION AND AUXILIARY PLANT INSPECTION AND INSPECTOR
CERTIFICATION PROGRAM (NON-NUCLEAR)
Ref: (a) COMUSFLTFORCOMINST 4790.3
(b) NAVSEA S9086-GY-STM-010, Naval Ships Technical
Manual (NOTAL)
(c) NAVSEA S9587-B1-MMA-010, Catapult Steam Support
Systems for CV/CVN Class Ships (NOTAL)
(d) NAVSEA S9534-AD-MMA-010, Steam Reboiler Maintenance
(NOTAL)
(e) NAVSEA S9221-D2-MMA-010, Steam Generating Plant
Inspection Manual (Non-Nuclear) (NOTAL)
(f) NAVSEA S9233-CJ-HBK-010, Navy Diesel Engine
Inspector Handbook (NOTAL)
(g) NAVEDTRA 10500
1. Purpose
a. To establish policy for the inspection requirements of
all U.S. Navy diesel engines, conventional steam generating
plants, re-boilers, steam catapult accumulators, and marine gas
turbine engines; and to outline command and incumbent functional
areas of responsibility.
b. To establish policy governing the certification for all
steam generating plant inspectors, diesel engine inspectors, and
marine gas turbine inspectors.
c. This revision removes the technical information to
include inspection periodicity requirements, which is published
in references (a) through (f) and focuses on governing policies.
This is a complete revision and should be reviewed in its
entirety.
2. Cancellation. OPNAVINST 9220.3.
资源描述:

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭